Life-cycle assessment of residential-scale grid-connected photovoltaic system in Malaysia based on monocrystalline silicon modules

Atiqah Hamizah Mohd Nordin

Abstract


Even though PV systems have been promoted as a green form of electrification, such systems are still contributing to environmental impacts after considering life-cycle impact during material extraction, manufacturing processes of its components, installation, operation, and maintenance. This paper presents a life-cycle assessment to quantify the environmental impact of residential-scale grid-connected PV systems in Malaysia using monocrystalline silicon PV module. LCA had been carried out by using OpenLCA 1.8 software, Ecoinvent 3.5 database, and impact assessment method of IMPACT2002+ and CED. The influence of varying system capacity from 3 to 12 kWp, system lifetime of 21, 25 and 30 years, and solar irradiation of 1560.8, 1651.8, & 1935.5 kWh/m2/yr, were investigated. The results revealed that the greenhouse gas emissions rate, cumulative energy demand, and energy payback time of residential-scale grid-connected PV systems in Malaysia ranged from 37.97 to 67.26 g CO2-eq/kWh, 4387.10 to 4699.99 MJ/m2, and 6.37 to 7.90 years, respectively. This study also evaluated indicators of energy return on investment. The overall finding implies that the installation of residential-scale grid-connected PV systems in Malaysia offers significant potential for GHG emissions reduction in the country. 


References


Sustainable Energy Development Authority of Malaysia, “Annual Report 2017,” 2017.

A. Stoppato, “Life cycle assessment of photovoltaic electricity generation,” Energy, vol. 33, no. 2, pp. 224–232, Feb. 2008.

K. Kaliappan, M. Sankar, B. Karthikeyan, B. Vineeth, and V. C. Raju, “Analysis of solar energy technology in leading countries,” Int. J. Power Electron. Drive Syst., vol. 10, no. 4, pp. 1995–2004, 2019.

M. Benghanem, A. Almohammedi, M. Taukeer Khan, and A. A. Al-Mashraqi, “Effect of dust accumulation on the performance of photovoltaic panels in desert countries: A case study for Madinah, Saudi Arabia,” Int. J. Power Electron. Drive Syst., vol. 9, no. 3, pp. 1356–1366, 2018.

H. Kim, K. Cha, V. M. Fthenakis, P. Sinha, and T. Hur, “Life cycle assessment of cadmium telluride photovoltaic (CdTe PV) systems,” Sol. Energy, vol. 103, pp. 78–88, May 2014.

N. A. Ludin et al., “Prospects of life cycle assessment of renewable energy from solar photovoltaic technologies: A review,” Renew. Sustain. Energy Rev., vol. 96, pp. 11–28, Nov. 2018.

R. Battisti and A. Corrado, “Evaluation of technical improvements of photovoltaic systems through life cycle assessment methodology,” Energy, vol. 30, no. 7, pp. 952–967, Jun. 2005.

A. Sumper, M. Robledo-García, R. Villafáfila-Robles, J. Bergas-Jané, and J. Andrés-Peiró, “Life-cycle assessment of a photovoltaic system in Catalonia (Spain),” Renew. Sustain. Energy Rev., vol. 15, no. 8, pp. 3888–3896, Oct. 2011.

U. Desideri, S. Proietti, F. Zepparelli, P. Sdringola, and S. Bini, “Life Cycle Assessment of a ground-mounted 1778kWp photovoltaic plant and comparison with traditional energy production systems,” Appl. Energy, vol. 97, pp. 930–943, Sep. 2012.

M. Ito, M. Kudo, M. Nagura, and K. Kurokawa, “A comparative study on life cycle analysis of 20 different PV modules installed at the Hokuto mega-solar plant,” Prog. Photovoltaics Res. Appl., vol. 19, no. 7, pp. 878–886, Nov. 2011.

M. Xie et al., “Pollutant payback time and environmental impact of Chinese multi-crystalline photovoltaic production based on life cycle assessment,” J. Clean. Prod., vol. 184, pp. 648–659, May 2018.

V. M. Fthenakis and H. C. Kim, “Photovoltaics: Life-cycle analyses,” Sol. Energy, vol. 85, no. 8, pp. 1609–1628, Aug. 2011.

G. Finnveden et al., “Recent developments in Life Cycle Assessment,” J. Environ. Manage., vol. 91, no. 1, pp. 1–21, Oct. 2009.

R. Turconi, A. Boldrin, and T. Astrup, “Life cycle assessment (LCA) of electricity generation technologies: Overview, comparability and limitations,” Renew. Sustain. Energy Rev., vol. 28, pp. 555–565, Dec. 2013.

K. Kato, A. Murata, and K. Sakuta, “Energy pay-back time and life-cycle CO2 emission of residential PV power system with silicon PV module,” Prog. Photovoltaics Res. Appl., vol. 6, no. 2, pp. 105–115, Mar. 1998.

E. A. Alsema, P. Frankl, and K. Kato, “Energy pay-back time of photovoltaic energy systems: present status and prospects,” in 2nd World Conference on Photovoltaic Solar Energy Conversion, 1998, p. 6.

M. de Wild-Scholten and E. A. Alsema, “Environmental Life Cycle Inventory of Crystalline Silicon Photovoltaic Module Production,” MRS Proc., vol. 895, no. December, pp. 0895-G03-04, Feb. 2005.

E. Alsema and M. J. de Wild, “Environmental Impact of Crystalline Silicon Photovoltaic Module Production,” MRS Proc., vol. 895, no. September 2004, pp. 0895-G03-05, Feb. 2005.

N. Jungbluth, R. Dones, and R. Frischknecht, “Life Cycle Assessment of Photovoltaics; Update of the ecoinvent Database,” MRS Proc., vol. 1041, pp. 1041-R01-03, Feb. 2007.

L. Lu and H. X. Yang, “Environmental payback time analysis of a roof-mounted building-integrated photovoltaic (BIPV) system in Hong Kong,” Appl. Energy, vol. 87, no. 12, pp. 3625–3631, 2010.

G. Hou et al., “Life cycle assessment of grid-connected photovoltaic power generation from crystalline silicon solar modules in China,” Appl. Energy, vol. 164, pp. 882–890, Feb. 2016.

L. Y. Seng, G. Lalchand, and G. M. Sow Lin, “Economical, environmental and technical analysis of building integrated photovoltaic systems in Malaysia,” Energy Policy, vol. 36, no. 6, pp. 2130–2142, Jun. 2008.

International Organization for Standardization, “ISO 14040:2006 Environmental management-Life cycle assessment-Principle and framework,” 2006.

International Organization for Standardization, “ISO 14044:2006 Environmental management - Life cycle assessment - Requirements and guidelines,” 2006.

R. Frischknecht et al., “Life Cycle Inventories and Life Cycle Assessment of Photovoltaic Systems, International Energy Agency (IEA) PVPS Task 12, Report T12-04:2015,” 2015.

L. Tschümperlin, P. Stolz, and R. Frischknecht, “Life cycle assessment of low power solar inverters (2.5 to 20 kW), Treeze Ltd., commissioned by Swiss Federal Office of Energy (SFOE),” 2016.

R. Frischknecht et al., Methodology Guidelines on Life Cycle Assessment of Photovoltaic Electricity, 3rd edition, IEA PVPS Task 12, International Energy Agency Photovoltaic Power Systems Programme. Report IEA-PVPS T12-06:2016. 2016.

S. I. Sulaiman, S. Shaari, and A. M. Omar, Solar Irradiation Data for Malaysia. Sustainable Energy Development Authority Malaysia, 2012.

S. Humbert, A. De Schryver, X. Bengoa, M. Margni, and O. Jolliet, IMPACT 2002+: User Guide. 2014.

N. Jungbluth, M. Stucki, K. Flury, R. Frischknecht, and S. Büsser, “Life Cycle Inventories of Photovoltaics,” 2012.




DOI: http://doi.org/10.11591/ijpeds.v11.i2.pp%25p
Total views : 11 times

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.