A special method for simultaneous optimization of electrical grid interconnections and cable size in wind farms

Fareed Kadhim Hussein Al-Khafaji, Ali Abdul Hussein Kareem Al Humaidani, Adiy Aljaberi, Iman Mohammed Abd Zaid

Abstract


Modern wind farms are considered one of the most important sources of energy today. The biggest cost of the farm is the cost of electrical connection to the farmers (constituting the largest part of the aesthetic cost of the farm) and finding the best method for electrical connection (the optimal method) for wind turbines (WTS), as well as the optimal size and measurement of electrical cables. Here, the (harmonious) search algorithm solves the optimization problem and the method of digging the soil in order to lay the cables in it. Two cases will be discussed in order to calculate the optimal size of the cables, namely partial calculation and optimal calculation for connection schemes in the best method for wind farms (OWFS). Also, the total cost, shipping methods, methods of digging extensions into the soil and the different classifications for turbines (wind turbines) will be addressed in order to obtain the best investment for them, so that we reach the optimal delivery and the lowest possible cost in a coordinated and thoughtful manner.

Keywords


Cable size; Electrical grid interconnections; Harmonious; Resizing; Wind farm

Full Text:

PDF


DOI: http://doi.org/10.11591/ijpeds.v14.i3.pp1809-1815

Refbacks

  • There are currently no refbacks.


Copyright (c) 2023 Fareed Kadhim Hussein Al-Khafaji, Ali Abdul Hussein Kareem Al Humaidani, Adiy Aljaberi, Iman Mohammed Abd Zaid

Creative Commons License

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.